Controlling

Chapter 83 topics, part by part5 min read

Meaning and importance of controlling, its limitations, how planning and controlling are related, and the steps of the control process, including critical point control and management by exception.

📏
Part

Concept, Importance and Limits

2 topics to learn here

Concept, Importance and Limits · Topic 1 of 2

Meaning and importance of controlling

Last function but linked to planning; importance: goals, judging standards, resource use, motivation, order and discipline, coordination.

  1. 1

    Controlling ensures that activities are performed as planned; it compares actual results with standards, finds deviations and takes corrective action.

  2. 2

    It is the last function, but it is goal-oriented and both a backward– and forward-looking function, as its findings feed into future planning.

  3. 3

    Importance: helps achieve organisational goals; judges the accuracy of standards; makes efficient use of resources; improves employee motivation (people know what is expected); ensures order and discipline; and facilitates coordination.

ImportanceAchieves goalsTests standardsSaves resourcesMotivates staffEnsures order, disciplineCoordinates action
❓ Can you answer?

Why is controlling called forward-looking?

Concept, Importance and Limits · Topic 2 of 2

Limitations, and planning versus controlling

Limitations: quantitative standards hard, little control on external factors, resistance, costly. Planning and controlling are inseparable; planning is looking ahead, controlling looking back.

  1. 1

    Limitations: difficulty in setting quantitative standards for things like morale or job satisfaction; little control over external factors (policy, technology, competition); resistance from employees who feel watched; and it is costly in time and money.

  2. 2

    Planning and controlling are inseparable twins: planning sets the standards; without them control has no basis, and without control planning is meaningless.

  3. 3

    ‘Planning is looking ahead and controlling is looking back’ is only partly true: control also looks ahead by suggesting improvements.

  4. 4

    Planning is prescriptive; controlling is evaluative.

Two sides of one coinPlanning• Looks ahead• Sets standards• PrescriptiveControlling• Looks back (and ahead)• Checks results• Evaluative
❓ Can you answer?

Is ‘controlling is looking back’ fully correct?

🔁
Part

The Control Process

1 topic to learn here

The Control Process · Topic 1 of 1

The controlling process

Setting standards → measuring performance → comparing → analysing deviations (critical point control, management by exception) → corrective action.

  1. 1

    Setting performance standards: quantitative (cost, output, time) or qualitative (goodwill, motivation), as benchmarks.

  2. 2

    Measurement of actual performance: by personal observation, sample checking, reports.

  3. 3

    Comparing actual performance with standards to find the deviation.

  4. 4

    Analysing deviations: using critical point control (focus on key result areas, e.g. labour cost) and management by exception (only significant deviations beyond permissible limits are brought to management’s notice: ‘an attempt to control everything may end up controlling nothing’).

  5. 5

    Taking corrective action: e.g. training for workers who miss standards, repairing machines, revising standards if they were unrealistic.

Steps in controllingStandardsMeasureCompareAnalyseCorrect
🧮 Worked example

A factory sets a 2% limit on wastage; this month wastage is 2.3% while canteen costs rose slightly. What does management by exception say?

  1. Only significant deviations, beyond the allowed limit, need top attention
  2. Wastage crossed the limit

Answer: Report the wastage deviation; minor items are handled at lower levels.

❓ Can you answer?

What term describes the gap between standard and actual performance?

🔤 Key words

Each science word with its meaning and its Hindi name. Cover the meaning and try to say it first.

  • Controllingनियंत्रण

    Ensuring activities go as planned and correcting deviations.

  • Standardमानक

    Benchmark against which performance is measured.

  • Deviationविचलन

    Gap between standard and actual performance.

  • Corrective actionसुधारात्मक कार्यवाही

    Steps to remove deviations.

  • Critical point controlमहत्त्वपूर्ण बिंदु नियंत्रण

    Focusing on key result areas.

  • Management by exceptionअपवाद द्वारा प्रबंध

    Only significant deviations go to management.

  • Feedbackप्रतिपुष्टि

    Information on results used to adjust plans.

  • Key result areaमुख्य परिणाम क्षेत्र

    Area critical to success, e.g. labour cost.

  • Backward-lookingपश्चदर्शी

    Control checks past performance.

  • Forward-lookingअग्रदर्शी

    Control also guides future plans.

🛂 One-look revision

One stamp per part. Read the key fact, then try to recall the whole topic.

  • ControllingResults vs standardsCorrective action
  • NatureGoal-orientedBackward and forward looking
  • ImportanceGoals, standards, resourcesMotivation, order, coordination
  • LimitationsQuantitative standards hardExternal factors, cost, resistance
  • Planning linkInseparable twinsPlanning sets standards
  • StepsSet, measure, compare, analyse, correct5 steps
  • Critical point controlKey result areas
  • Management by exceptionOnly significant deviationsSaves time

❔ Questions and answers

Tap a question to see the answer. Try answering in your head first.

NCERT Very Short / Short Answer

Q1. State the meaning of controlling.
A
Ensuring that activities happen according to plans by comparing actual results with standards and correcting deviations.
Q2. Principle managers should use while dealing with deviations.
A
Management by exception (and critical point control).
Q3. One situation where control loses effectiveness.
A
When external factors (government policy, competition, technology) cannot be controlled, or when employees resist control.
Q4. Two standards for evaluating a Finance & Accounting department.
A
E.g. timely preparation of reports and cost of capital/budget adherence (accuracy of accounts, credit collection period).
Q5. Term for the gap between standard and actual performance.
A
Deviation.
QShort. ‘Planning is looking ahead and controlling is looking back.’ Comment.
A
Partly true: planning sets future targets and controlling checks past performance, but controlling also looks ahead by guiding future plans; the two are interrelated.
QShort. ‘An effort to control everything may end up controlling nothing.’ Explain.
A
This is management by exception: managers should focus only on significant deviations; controlling every small matter wastes time and loses focus.

NCERT Long Answer

Q1. Explain the importance of controlling.
A
Helps achieve goals, judges accuracy of standards, ensures efficient resource use, improves motivation, ensures order and discipline, and aids coordination.
Q2. Explain the steps in the controlling process.
A
Setting standards, measuring actual performance, comparing with standards, analysing deviations (critical point control and management by exception), and taking corrective action.
Q3. Explain the relationship between planning and controlling.
A
They are interdependent: planning provides standards and controlling ensures they are met and feeds back for better planning; planning without control is meaningless and control without planning is blind.

Back to the full listAll Class 12 Business Studies